Tunnel

L:  HOME-Tunnel

The Wushaoling tunnel project

2016-03-21

Wushaoling tunnel project consists of two bores with centers separated by 40m. It is designed to allow speeds of 160 km/h. The tunnel travels through complex geology, involving four regional fault zones and soft rock. The self drilling anchor method was adopted as the construction technique.